您所在位置: 网站首页 > 松科2井 > 野外工作进展

ICDP数据共享

发布时间:2016-12-21阅读次数:

 

2016_07_15 

depth 5360m,core 173 drilling 

 

2016_07_14 

depth 5358.74m,core 172 tripping out,core 171 data from 5311.36-5337.20m,drilled length 25.84m,core recovery 25.07m,97.0% 

2016_07_13 

depth 5353m,core 172 drillingdepth 5353m,core 172 drilling 

2016_07_12 

depth 5350,core 172 drillin 

13512722