您所在位置: 网站首页 > 松科2井 > 野外工作进展

ICDP数据共享

发布时间:2016-12-21阅读次数:

2016_07_19 

depth 5371.99m,core 175 tripping out ,core 172 data ,from 5337.20-5358.74m,drilledn length 21.54m,core recovery 21.38m,99.3% 

 

2016_07_18  

depth5369.64m,core 175 tripping in 

 

2016_07_17 

depth 5369.64m,core 174 tripping out 

 

2016_07_16  

depth 5362.53m,core 174 tripping in

 

13512722