您所在位置: 网站首页 > 松科2井 > 野外工作进展

ICDP数据共享

发布时间:2016-12-21阅读次数:

2016_07_24 

depth 5394,core 177 drilling 

2016_07_23 

depth 5382.24,core 177 tripping in

 

2016_07_22 

depth 5391.63m,core 177 tripping in,core 176 data from 5371.99-5381.63m,drilled length 9.64m,core recovery 9.16m,95.0% 

 

2016_07_21 

depth 5391.63m,core 176 tripping out,core 175 data,from 5369.64-5371.99m,drilled length 2.35m,core recovery 2.00m,85.1 

 

2016_07_20 

depth 5377m,core 176 drilling

13512722