您所在位置: 网站首页 > 松科2井 > 野外工作进展

ICDP数据共享

发布时间:2016-12-21阅读次数:

 2016-10-3

depth 5814.16m,reparing mechine

2016-10-2

depth 5814.16m, reparing mechine

2016-10-1

depth 2814.16m,core 210 tripping out

 

2016-9-30

 depth 5814.16m,core 210 tripping in

2016-9-29

depth 5814.16m,core 209 tripping out 

2016-9-28

 depth 5804.80m,core 209 tripping in

2016-9-27 

depth 5804.73m,core 208 tripping out 

13512722